Infrastructure

The State of Geneva will have invested 549 million Swiss francs by 2017

Major works Infrastructure - 2016 Key Figures at HUG in Geneva

Main Projects

projets table

549 million invested

Renovations in 2016

  • Fitting out the geriatric emergency department at Trois-Chêne (2 million)
  • Creation of isolation rooms in oncology (1.7 million)
  • Rearrangement of the intermediate care beds in neurology and neurosurgery (0.8 million)

11 million investied

Equipment

  • 319’350’000 Swiss francs: total value of the equipment
  • 38’370 items of equipment inventoried
  • 9 million invested in 2016

Main items of equipment

equipment table

Last update : 09/07/2024